Monday, June 09, 2025
57.0°F
Bruce Liefring of the Montana Department of Transportation inspects the Route 37 bridge in Libby Thursday morning. Bob Vosen, a construction engineer with the department’s District One, said they inspect the bridge — one of 120 in Lincoln County his department oversees — every two years as a matter of routine maintenance. It is in sound shape, he said. Traffic was reduced to one lane of travel at a time during the inspection. (John Blodgett/The Western News)

Stories this photo appears in:

Construction resumes on Highway 37 bridge preservation project
April 15, 2025 7 a.m.

Construction resumes on Highway 37 bridge preservation project

There is a 10-foot width restriction through the project area. Wide loads will need to find an alternate route.

Bridge inspection in Libby
August 3, 2018 4 a.m.

Bridge inspection in Libby